Project cargo in Pakistan from Ibrahim Logistics: Over-size, heavy-lift and break-bulk cargo for power, energy, infrastructure and industrial projects.
Turbines, transformers, boilers and production lines do not fit in a standard container. Project cargo needs route surveys, special trailers, cranes, police escorts and careful coordination with the port and the site.

We plan project shipments from the supplier's factory to the foundation at site – including customs, permits and the last kilometre.
What our project cargo service covers
- Break-bulk and heavy-lift shipping
- Flat-rack and open-top containers
- Route surveys and permits
- Low-bed and multi-axle trailers
- Crane and rigging coordination
- Customs clearance for project imports
Project cargo in Pakistan – how it works
- Technical data: dimensions, weights, lifting points
- Route survey and method statement
- Shipping and port handling plan
- Customs and permits
- Inland transport with escort
- Delivery and offloading at site
Documents you will need
- Drawings and weights
- Commercial invoice and packing list
- Bill of lading
- Project import approvals
- Road permits
Tips to save time and cost
- Book 7–10 days before the cut-off in peak months – space and empties run short.
- Weigh the stuffed container (VGM) – overweight boxes are rolled at the terminal.
- Ask for the free days (demurrage / detention) in writing before booking.
- Use ISPM-15 treated pallets; untreated wood is refused in many countries.
What affects the cost of project cargo
- Ocean freight – per container (FCL) or per CBM (LCL), set by the line and the market.
- Surcharges – bunker (BAF), peak season and emergency surcharges when lines apply them.
- Origin local charges – terminal handling (THC), documentation, seal, VGM.
- Destination charges – THC, delivery order and port charges at the other end.
- Inland transport – factory to port, or port to warehouse.
- Free time – demurrage and detention if containers are kept longer than allowed.
Every quotation from us lists these items separately, so you can compare like with like.
Key terms explained
- FCL / LCL
- Full container load (you book the whole box) or less than container load (you share it).
- B/L
- Bill of lading – the receipt and title document for sea cargo.
- VGM
- Verified gross mass – the weighed weight of a packed container, required before loading.
- Free time
- Days allowed at the port (demurrage) or outside it (detention) before charges start.
- Cut-off
- The last time to deliver the container and documents for a sailing.
Ports and countries we cover
We work at every sea port and major dry port of Pakistan:
- Karachi Port
- Port Qasim
- Gwadar Port
- Lahore Dry Port
- Sialkot Dry Port
- Faisalabad Dry Port
- Multan Dry Port
- Islamabad Dry Port
- Peshawar Dry Port
- Quetta Dry Port
- Hyderabad Dry Port
Popular trade lanes:
- China to Pakistan
- UAE to Pakistan
- Pakistan to USA
- Pakistan to UK
- Pakistan to Germany
- Pakistan to Saudi Arabia
See all sea ports and dry ports and worldwide shipping lanes.
Why shippers choose Ibrahim Logistics
- All ports, one team – Karachi Port, Port Qasim, Gwadar, every major dry port and the Afghan border.
- Every shipping line – we compare carriers for each shipment instead of selling one line.
- Offices in Karachi, Lahore and Islamabad – documents and examinations handled by our own staff.
- Clear quotations – freight, local charges and clearance listed separately, no hidden extras.
- WhatsApp updates – status from booking to delivery, without chasing.
For a rate, call 0300 3364422 or send the details on WhatsApp – commodity, weight or volume, origin and destination – or use our online quote form. We reply the same working day.
Related services
Choose Ibrahim Logistics for project cargo in Pakistan: one coordinator, every major shipping line and our own staff at the ports and dry ports. Ask for project cargo in Pakistan rates on WhatsApp – we reply the same working day.
Project cargo in Pakistan – FAQs
What counts as project cargo?
Cargo that is over-size, over-weight or must arrive in a planned sequence for a project – machinery, plant equipment, transformers, steel structures.
Do you do route surveys?
Yes, before quoting heavy or over-dimensional moves.
Can you clear project imports?
Yes, including documents for project-specific duty concessions where they apply.